Wood River Trail is open. Please keep in mind Idaho Power is working on the power lines. In some areas this will have an impact on the Wood River Trail. Please check for updates in the notice section and on the map.
There is work occurring around the tunnel south of St. Luke's Hospital that is part of Idaho Power's project. The tunnel will remain open, but it is possible there will be delays for safety or the need to dismount and walk bikes. Please follow the work crew's instructions and, as always, approach tunnels with caution.
| Open | ABC | |||||||
|---|---|---|---|---|---|---|---|---|
Broadford/River St. Route 6.45mi | ||||||||
Saddle/Trail Creek Path 3.17mi | ||||||||
Sun Valley Trail / Elkhorn Path - (Elkhorn / Ketchum Loop) 8.32mi | ||||||||
Warm Springs Pathway 1.91mi | ||||||||
Wood River Trail 20.51mi |